PLUMBING & VENTING (Cont'd)
This project included installing two new floor drains, reconfiguring a restroom to maximize the use of the space, and to bring venting up to code. All of this tied into a septic pit that utilized an impaler pump to send the waste stream up and out into the sewer system.
Contact us at:
TOP
2
BOTTOM
RENOVATIONS